All future filings should be filed in case 18-cv-6563. This case is consolidated for all purposes with case number 18-cv-740. Status hearing set for 2/13/19 at 9:00 a.m. The parties should submit a proposed order and contact the courtroom deputy when they have done so. The Court adopted the following schedule proposed by the parties: Initial Disclosures of Both Parties (LPR 2.1) and Opening of Fact Discovery (LPR 1.3) are due by 10/31/18 Initial Infringement Contentions (LPR 2.2 and 2.3) are due by 11/7/18 Initial Non-Infringement Contentions and Invalidity Contentions (LPR 2.3 and 2.4) are due by 11/21/18 Response to Invalidity Contentions (LPR 2.5) are due by 12/5/18 Final Infringement, Unenforceability, and Invalidity Contentions (LPR 3.1) are due by 4/17/19 Final Non-Infringement, Enforceability, and Validity Contentions (LPR 3.2 and 3.3) are due by 5/15/19 the exchange of Claim Terms Needing Construction (LPR 4.1(a) should be completed by 5/29/19 the meet and confer regarding terms to be construed (LPR 4.1(b) should take place by 6/5/19 Fact discovery shall close on 6/26/19 Opening Claim Construction Brief(s) (by alleged infringer(s) (LPR 4.2(a) Joint Appendix (LPR 4.2(b) deadline is 7/3/19 responsive Claim Construction Brief (LPR 4.2(c) shall be due by 7/31/19 reply Claim Construction Brief 8/14/19 Joint Claim Construction Chart (LPR 4.2(f) shall be due by 8/21/19. ORDER: Order dated 10/31/18 is corrected #80. SCHEDULING ORDER Signed by the Honorable John Z. A more recent docket listingĪTTORNEY Appearance for Defendants Sysmex America, Inc., Sysmex Corporation by Sen Wang (Wang, Sen) This docket was last retrieved on February 26, 2020.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |